Client / Contractor:

Project Name:

Acid Resistant Floor Rebuild

Client:

Michell Wool

Scope of Work:

Basetec delivered a Novafast 1000 acid resistant floor rebuild and lining, during a time-critical shut down operation for Michell Wool, Australia’s largest wool buyer and processor.

The acid processing area floor had been affected over the years by the acid dissolving the floor structure, requiring a full thickness rebuild and drain relining.

Basetec crews worked to strip back the floor and rebuild to a robust and safe acid resistant finish in Lilac (the Australian standard colour for acid), with safety lines denoting walkways, fire extinguishers, and eye wash stations.