Client / Contractor:

Project Name:

BHP Refinery Electrolyte Piping

Client:

BHP Billiton

Scope of Work:

Basetec Services was engaged by BHP to design and construct new electrolyte pipework for their copperrefinery.The pipe work needed to be able to hold sulphuric acid at 80 degrees celsius.

The work was completed through a tight shut down period. The Basetec team had to design fabricate and install thepipework on-site.

Basetec was chosen for this project due to our ability to provide end-to-end solutions and a single point of liability.