Client / Contractor:

Project Name:

Christies Beach Wastewater Plant

Client:

SA Water

Scope of Work:

Basetec Services was engaged by SA Water to provide a turnkey pipework package for their Wastewater Plant at Christies Beach, South Australia. Basetec designed, supplied, and installed NovaFlo pipes and fittings, as well as 360° steel pipe support cradles. All spooling and installation was completed onsite.