Basetec were contracted for the Humidifying piping located in the Acid Plant at Olympic dam.

The scope of work included pipe system design and stress analysis, fabrication, hydrostatic testing and mechanical installation.

Basetec pre-fabricated and hydrotested the spools at our local Adelaide workshop to minimise the amount of site works which took place during a short shutdown period.

Pipe sizes: DN50-250

Pressure Rating: 1000kpa