Projects

Mining Plant System Upgrade.

Division:

Client:

Location:

Process: 

Asset Maintenance

Nyrstar

South Australia

Design, Supply & Install

Previous slide
Next slide

Basetec was engaged by Monadelphous to complete the supply and install of piping for the Nyrstar Port Pirie Transformation Project.

The job was broken down into 2 categories:

1. Supply and install of 50mm NB 1550 kPA Novafast 2000 SP piping system, equipped with an abrasion-resistant liner.

2. Pre-spooling and site install of Novafast 2000 pipe NB 50-250 during shutdown.