Basetec was engaged by Monadelphous to complete the supply and install of piping for the Nyrstar Port Pirie Transformation Project.
The job was broken down into 2 categories:
1. Supply and install of 50mm NB 1550 kPA Novafast 2000 SP piping system, equipped with an abrasion-resistant liner.
2. Pre-spooling and site install of Novafast 2000 pipe NB 50-250 during shutdown.