Basetec Services was contracted for the Manufacture and Installation of 90,000 Lt FRP Pump Station, for the water filtration system at the Edinborough RAAF base. The pump station was designed to recycle water for heavy vehicle wash bays.
Basetec Designed, Manufactured and Installed the pump station including civil works and on-site installation.
The pump station was designed for a 100-year operating life and was constructed from Novafast materials.